Electrical Power Outage Has Been Scheduled for Tuesday, May 15

Posted May 10th, 2012 at 3:35 pm.

As part of the high-voltage transformer-replacement project at Merion, an electrical power outage has been scheduled for Tuesday, May 15, which will affect the following buildings:
6-7 AM    All buildings will be without power (except for those buildings that have their own PECO electrical service—West House, GSSWSR, Human Resources, Pensby, Pen-y-Groes, Pen-y-Bryn, Arnecliffe, 300 Morris)
7 AM – 6 PM  Power will be restored to all buildings, except the following buildings which will continue to be without power: English House, Russian House, Canwyll House, Campus Center, Radnor, Merion, and Denbigh.
5- 6 PM  These additional buildings will be without power: Park Science Building, Cambrian Row, Schwartz Gym, and Public Safety.
6 PM  Power will be restored to all buildings.
Any questions should be directed to Facilities Services at X7930.